A full new deck and railing
For this project the customer needed a proper handrail in order to get his house insured. The customer decided to start fresh with a full new deck and railing with a low maintenance option that would last a long time. Because this was a mobile home we had to build the deck detached from the house.
The customer did the tear out and haul off of the existing deck and framing. We poured new 12” sonotube footings with wet set post base brackets. We framed the new deck with treated 4x4 posts, 4x8 treated beams and 2x8 treated joists, 16” on center. We installed the Trex enhanced basics decking with a border and hidden fastener decking system. We installed the new Trex Signature railing system.
‍